In March we discovered that the walls in the house were not properly insulated and so we had to redo them all beginning with the first floor. We took down the old kitchen because we wanted another layout of the space and so also opened up the living room by taking down a wall to the adjacent bedroom. We took down the two wood pillars holding up the kitchen ceiling as well and then prepared for a steal beam to replace the two.










